Temora to Lake Cowal Transmission Line

To ensure continuous and reliable electricity at the Lake Cowal Mine Site, a Transmission Line 110km long was constructed. Langford & Rowe carried out the survey for the project.

Many months were spent surveying from the electricity plant in Temora through to the mine site.